Electric Vehicle Rates

Monthly Rate

Availability
Available in all territory served by the Corporation in accordance with the Corporate Service Rules and Regulations. For charging of customers’ electric vehicles and other batter electric powered equipment on customers’ premises.

Applicability
Small: Applicable to all level 2 charging or combined level 2 and level 3 charging where the total demand for charging does not exceed 250 kVA.
Large: Applicable to all level 3 charging or combined level 2 and level 3 charging where the total demand for charging exceeds 250 kVA.

Types of Service
For single or multi-phase service.


EV Public

Rate ComponentSmallLarge
Facility Charge$44.42$171.99
Energy Charge from 10:00 p.m. to 5:00 a.m.$0.01150 per kWh*$0.1350 per kWh*
Energy Charge from 5:00 a.m. to 2:00 p.m.$0.1840 per kWh*$0.2160 per kWh*
Energy Charge from 2:00 p.m. to 10:00 p.m.$0.2760 per kWh*$0.3240 per kWh*

 

EV Commercial

Rate ComponentSmallLarge
Facility Charge$39.76$171.99
Energy Charge from 10:00 p.m. to 5:00 a.m.$0.0715 per kWh*$0.0425 per kWh*
Energy Charge from 5:00 a.m. to 2:00 p.m.$0.1005 per kWh*$0.0680 per kWh*
Energy Charge from 2:00 p.m. to 10:00 p.m.$0.1720 per kWh*$0.1020 per kWh*
Demand Rate from 10:00 p.m. to 2:00 p.m.$8.10 per kVA*
Demand Rate from 2:00 p.m. to 10:00 p.m.$19.44 per kVA*

Monthly Minimum Charge
The monthly minimum charge shall be the facility charge.

Terms and Conditions
a. The customer will pay, in advance of construction, all necessary costs estimated by JCREMC for facilities to serve the charging load.

b. Separate metering of charging units is preferred. If separate metering is not possible, service will be places on the EVPRS rate if total charging capacity is greater than the demand of all other loads tied to the meter. If EV charging capacity is less than the demand of all other loads, the appropriate time of use rate will apply for a single-phase or multi-phase application.

c. Customer will own and maintain any EV chargers.

d. In cases of EV charging loads in excess of 500kVA, JCREMC reserves the right to analyze impact of the load on the electric circuit and distribution system to determine if additional capacity requirements may be necessary.  In these cases, JCREMC reserves the right to implement special contract terms and pricing to mitigate any potential infrastructure requirements or loading issues.

Rate Adjustments
The above rates are subject to rate adjustments stated in Appendix A.

Other Charges and Terms of Service
This schedule is applicable to charges and other terms of service outlined in Appendix B.