Multi-Phase Commercial Schedule MPC
Commercial RatesSchedule MPC
Availability
Available in all territory served by the Corporation, in accordance with Corporate Service Rules and Regulations.
Applicability
Applicable to commercial consumers up to and including 249 kVA. For determination of the applicable kVA capacity, the Corporation shall consider i) circumstances where the kVA capacity installed by the Corporation exceeds the consumers load requirements by more than standard design, and ii) circumstances where installed capacity is shared by more than one consumer in which case the Corporation shall equitably allocate the KVA capacity between consumers.
Type of Service
Multi-phase 60 hertz at 120/208 or 277/480 volts.
Monthly Rate
Facility Charge: | $75.00 | per month |
Energy Charge: | ||
From 11:00pm – 5:00am | $0.0735 | per kWh* |
From 5:00am – 11:00pm | $0.0941 | per kWh* |
*The on and off-peak energy charges include the distribution delivery charge of $0.01275 per kWh.
Minimum Monthly Charge
The minimum monthly charge shall be the Facility Charge.
Terms and Conditions
- In general, motors having a rated capacity in excess of ten horsepower (10 h.p.) must be three-phase.
- In those cases where the consumer is not located adjacent to three-phase lines of the Corporation, service will be rendered only after the following conditions are met.
- The consumer will give satisfactory assurance by means of a written agreement as to the character, amount and duration of the business offered.
- In no case, however, will the minimum bill for three-phase service be less than that previously specified under the “Monthly Minimum Charge”.
Rate Adjustments
The above rates are subject to rate adjustments stated in Appendix A.
Other Charges and Terms of Service
This schedule is applicable to charges and other terms of service outlined in Appendix B.